Red Kap Elastic Insert Pant PT60
Designed for both women (PT61) and men these IL50-certified pants have classic good looks with a waist that has elastic inserts for added flex and comfort. Stands up to 50 industrial launderer washings.
- 7.5-ounce
- 65/35 poly/cotton twill Side elastic insert Two front and back pocketsNot all inseam lengths available in every waist size.
Price
Color
Size
Quantity
minimum quantity: x available in bundles of: x Product ordered in bundles.
Sizing Details
Size Guide
3030 | 3032 | 3037 | 3230 | 3232 | 3234 | 3237 | 3430 | 3432 | 3434 | 3437 | 3630 | 3632 | 3634 | 3637 | 3830 | 3832 | 3834 | 3837 | 4030 | 4032 | 4230 | 4232 | 4430 | 4432 | 4630 | 2836 | 4036 | 4236 | 4436 | 4636 | 4836 | 5036 | 5236 | 5436 | 5636 | 5836 | 6036 | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Waist Extended | ||||||||||||||||||||||||||||||||||||||
Waist Relaxed | ||||||||||||||||||||||||||||||||||||||
Avail. Lengths | ||||||||||||||||||||||||||||||||||||||
Cuff Opening |
Shipping
Shipping
This item is typically produced within 5 to 7 business days.
Production time is dependent on total order size and time of the year; average production time increases to 7 to 10 business days during the months of November and December.
Transit time is additional and depends on the destination, typically within 5 business days.
The UPS Ground Time-in-Transit Map below provides a full color U.S. map illustrating the typical number of transit days, based on the ship date, for delivery via UPS Ground services. (Last Updated March 2024)
Have a must have in-hands deadline? Reach out to us at Hello@OurWearhouse.com to discuss rush production and/or shipping options and feasability.