Team 365 Youth Zone Performance Short TT11SHY
Price
Color
Size
Quantity
minimum quantity: x available in bundles of: x Product ordered in bundles.
Sizing Details
Size Guide
S | M | L | XL | |
---|---|---|---|---|
Waist Width | 11.5 | 12.5 | 13.5 | 14.5 |
Chest | 26-27 | 28-30 | 31-32 | 33-34 |
Inseam Length | 7 | 7 | 7 | 7 |
Shipping
Shipping
This item is typically produced within 5 to 7 business days.
Production time is dependent on total order size and time of the year; average production time increases to 7 to 10 business days during the months of November and December.
Transit time is additional and depends on the destination, typically within 5 business days.
The UPS Ground Time-in-Transit Map below provides a full color U.S. map illustrating the typical number of transit days, based on the ship date, for delivery via UPS Ground services. (Last Updated March 2024)
Have a must have in-hands deadline? Reach out to us at Hello@OurWearhouse.com to discuss rush production and/or shipping options and feasability.